Tanks

Large capacity tanks are produced in a separate line. In this production line, parts and mountings Including the plates, dished ends, sockets, valves and fittings, are sourced externally The process begins with the shearing and rolling of plates into the main cylindrical shells.

Cylinders

With the exception of the basic raw material of steel coils/strips, valve necks and gas flow control valves, which are sourced externally, the whole process is carried out in our factory, in the second industrial city in Riyadh The Cylinder production is carried out in three separate divisions In the first stage, the metal fabrication takes place.

Scroll to Top