TANK MANUFACTURING Products

TANK MANUFACTURING

TANK MANUFACTURING Products

Large capacity tanks are produced in a separate line.  In this production line, parts and mountings are sourced externally including the dished ends, name plates, sockets, valves and regulators.

 

The process beings with the shearing and rolling of plates into the main cylindrical shells.  The longitudinal seams are welded and dished ends beaded.  Socket holes are cut into the shells and the socket welded.  The dished ends are mated and welded onto the shells.  Accessories are welded on prior to radiographic examinations of all main welds.  By this stage, the tanks are complete except for their valves.  After hydro-testing, the tank surfaces are thoroughly cleaned by shot-blasting.  They are then metallized and painted.  When dry, the tanks are ready for the final step of valve fitting and testing for tightness.

 

Tank design, production, testing and inspection procedures conform to Saudi Standards for the storage and transportation of LP gases.  Furthermore, the production process conforms fully to the Technical Rules for Pressure Vessels Manufacture as set out by AD-Merkblatter Code of Construction of Germany.

 

 

Copyrights © 2015 All Rights Reserved by Saudi Gas Cylinder Factory.
info@saudigas.com · +966-11-0000-000 ·